Skip to main content

Scan History

Recent Scans

Component ID Type Location Time Status
QR-2024-001 Elastic Rail Clip Mumbai Central 2 mins ago Active
QR-2024-002 Rail Pad Delhi Junction 15 mins ago Inspection Due
QR-2024-003 Sleeper Chennai Central 1 hour ago Maintenance

Scan Statistics

Today's Scans

247

This Week

1,834

Total Scanned

45,921

Railway control panel interface

Scanning Interface

Mobile app interface for real-time component scanning

Railway technology interface

Quick Actions

Perform bulk scans and generate inspection reports

Train tracks in park

Location Tracking

GPS-enabled scanning with precise location data

Inventory

Total Components

23.4 Cr

In Stock

18.7 Cr

In Transit

2.1 Cr

Low Stock

4.6 Cr

Component Inventory

Component Type SKU Quantity Location Last Updated
Industrial warehouse inventory
Elastic Rail Clips
Heavy-duty clips
ERC-001 5,847,291 Warehouse A 2 hours ago
Green and yellow hangar interior
Rail Pads
Vibration dampening
RP-002 3,294,735 Warehouse B 1 day ago
GrowHaus Supply Co
Concrete Sleepers
Pre-stressed concrete
CS-003 2,156,892 Warehouse C 3 days ago

Manufacturers

Certified suppliers for 23+ crore railway components

Manufacturer Directory

Industrial manufacturing facility

RailTech Industries Ltd.

ISO 9001 certified • 15+ years experience

Elastic Clips Rail Pads
Annual Supply: 8.2 Cr units ★ 4.8/5
Factory facility

MetroTrack Components

IRIS certified • Advanced laser marking

Sleepers Fasteners
Annual Supply: 6.8 Cr units ★ 4.9/5
Manufacturing facility

SteelWorks Corporation

Government approved • 50+ years legacy

Liners Special Alloys
Annual Supply: 5.4 Cr units ★ 4.7/5

Certifications

ISO 9001 18
IRIS Certified 12
Govt Approved 25

92% compliance rate

Performance Metrics

On-time Delivery

94.7%

Quality Score

4.8/5

Active Suppliers

45

Supply Chain Overview

45

Active Suppliers

23.4 Cr

Annual Units

₹2,847 Cr

Total Value

100%

QR Traceable

Inspection Records

Real-time quality checks across 23+ crore components

Total Inspected

18.7 Cr

80% of total inventory

Passed Inspection

17.9 Cr

96% pass rate

Failed Inspection

0.8 Cr

Requires replacement

Pending Review

4.7 Cr

20% of total

Recent Inspections

Component ID Inspector Status Location Date
QR
2024-ERC-001
Ravi Kumar Passed Mumbai Central 2 hours ago
QR
2024-RP-047
Priya Sharma Failed Delhi Junction 4 hours ago
QR
2024-SLP-123
Amit Patel Pending Chennai Central 6 hours ago

Inspection Tools

Railway inspection

Inspection Guidelines

Inspection guidelines
  • • Check QR code readability
  • • Verify component integrity
  • • Record GPS location
  • • Upload photo evidence

Quick Actions

Railway inspection technology

Daily Inspections

2,847

Components checked today

Active Inspectors

156

Field staff deployed

Issues Resolved

12,394

This month

Reports

Comprehensive analytics for 23+ crore railway components

Performance Dashboard

Scan Volume Trends

Component Status Distribution

Regional Performance

Railway analytics

Northern Zone

5.2M components tracked

98.7%
Data visualization

Western Zone

4.8M components tracked

97.2%
Freight analysis

Southern Zone

6.1M components tracked

99.1%

Quick Reports

Export Options

Key Metrics

Total Scans

247.8M

Compliance Rate

98.3%

Cost Savings

₹847 Cr

Automated Reporting

Daily Reports

Auto-generated at 6 AM

Real-time Alerts

Instant notifications

Custom Reports

On-demand generation

Predictive Analytics

AI-powered insights

Settings

System Configuration

Current key: ••••••••••

Theme Settings

Dark Mode
Auto-save
Black purple dashboard

Security Settings

Manage access controls and permissions

BMW interior lighting

User Management

Control user roles and permissions

Purple car bumper

Backup & Restore

Save and restore system configurations