Scan History
Recent Scans
| Component ID | Type | Location | Time | Status |
|---|---|---|---|---|
| QR-2024-001 | Elastic Rail Clip | Mumbai Central | 2 mins ago | Active |
| QR-2024-002 | Rail Pad | Delhi Junction | 15 mins ago | Inspection Due |
| QR-2024-003 | Sleeper | Chennai Central | 1 hour ago | Maintenance |
Scan Statistics
Today's Scans
247
This Week
1,834
Total Scanned
45,921
Scanning Interface
Mobile app interface for real-time component scanning
Quick Actions
Perform bulk scans and generate inspection reports
Location Tracking
GPS-enabled scanning with precise location data
Inventory
Total Components
23.4 Cr
In Stock
18.7 Cr
In Transit
2.1 Cr
Low Stock
4.6 Cr
Component Inventory
| Component Type | SKU | Quantity | Location | Last Updated |
|---|---|---|---|---|
|
Elastic Rail Clips
Heavy-duty clips
|
ERC-001 | 5,847,291 | Warehouse A | 2 hours ago |
|
Rail Pads
Vibration dampening
|
RP-002 | 3,294,735 | Warehouse B | 1 day ago |
|
Concrete Sleepers
Pre-stressed concrete
|
CS-003 | 2,156,892 | Warehouse C | 3 days ago |
Manufacturers
Certified suppliers for 23+ crore railway components
Manufacturer Directory
RailTech Industries Ltd.
ISO 9001 certified • 15+ years experience
MetroTrack Components
IRIS certified • Advanced laser marking
SteelWorks Corporation
Government approved • 50+ years legacy
Certifications
92% compliance rate
Performance Metrics
On-time Delivery
94.7%
Quality Score
4.8/5
Active Suppliers
45
Supply Chain Overview
45
Active Suppliers
23.4 Cr
Annual Units
₹2,847 Cr
Total Value
100%
QR Traceable
Inspection Records
Real-time quality checks across 23+ crore components
Total Inspected
18.7 Cr
Passed Inspection
17.9 Cr
Failed Inspection
0.8 Cr
Pending Review
4.7 Cr
Recent Inspections
| Component ID | Inspector | Status | Location | Date |
|---|---|---|---|---|
|
QR
2024-ERC-001
|
Ravi Kumar | Passed | Mumbai Central | 2 hours ago |
|
QR
2024-RP-047
|
Priya Sharma | Failed | Delhi Junction | 4 hours ago |
|
QR
2024-SLP-123
|
Amit Patel | Pending | Chennai Central | 6 hours ago |
Inspection Tools
Inspection Guidelines
- • Check QR code readability
- • Verify component integrity
- • Record GPS location
- • Upload photo evidence
Quick Actions
Daily Inspections
2,847
Components checked today
Active Inspectors
156
Field staff deployed
Issues Resolved
12,394
This month
Reports
Comprehensive analytics for 23+ crore railway components
Performance Dashboard
Scan Volume Trends
Component Status Distribution
Regional Performance
Northern Zone
5.2M components tracked
Western Zone
4.8M components tracked
Southern Zone
6.1M components tracked
Quick Reports
Export Options
Key Metrics
Total Scans
247.8M
Compliance Rate
98.3%
Cost Savings
₹847 Cr
Automated Reporting
Daily Reports
Auto-generated at 6 AM
Real-time Alerts
Instant notifications
Custom Reports
On-demand generation
Predictive Analytics
AI-powered insights
Settings
System Configuration
Theme Settings
Security Settings
Manage access controls and permissions
User Management
Control user roles and permissions
Backup & Restore
Save and restore system configurations